Changes between Version 3 and Version 4 of MSP321


Ignore:
Timestamp:
Sep 10, 2014 8:33:18 AM (10 years ago)
Author:
hwalker
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • MSP321

    v3 v4  
    33This covers 29 Nov 2014 to 01 Feb 2015 (orbits 2256 to 2283). There are manoeuvres planned during December and January, and as the template Bryant plots show several BM1 sessions have been requested for the repeat of the Pitout GI investigations. The manoeuvres will affect the perigees of orbits 2269, 2280, and manoeuvres with C3 will additionally affect 2273, 2276. the ascii listing is on the web, and the Bryant plots are there too, as well as attached below. The deadline for input is 20 August, revised to 25 August.
    44
    5 The draft plan is released on 29 August, with draft Bryant plots and a draft list orbit by orbit of BM1 sessions. The review deadline has been changed to 2 Sep (Close of Business). Two orbits have been left for WBD at the Bow Shock, and these will be used for BM2 (2271 and 2282), and WEC will operate C3 internally for the constraints on WBD periods. December is dominated by Pitout repeat BM1 sessions, and January by Bow Shock BM1 sessions. The updated plan was released on 9 September - the Bryant plots and the list of D0 periods are attached.
     5The draft plan is released on 29 August, with draft Bryant plots and a draft list orbit by orbit of BM1 sessions. The review deadline has been changed to 2 Sep (Close of Business). Two orbits have been left for WBD at the Bow Shock, these will be used for BM2 (2271 and 2282), and WEC will operate C3 internally for the constraints on WBD periods. December is dominated by Pitout repeat BM1 sessions and Magnetopause BM1 periods, and January by Bow Shock BM1 sessions. The updated plan was released on 9 September - the Bryant plots and the list of D0 periods are attached. The orbit-by-orbit analysis is also attached.