Changes between Version 3 and Version 4 of MSP332


Ignore:
Timestamp:
May 13, 2015 10:42:05 AM (9 years ago)
Author:
hwalker
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • MSP332

    v3 v4  
    55
    661 May: The draft Bryant plots and lists of BM sessions are available as pdfs. The main target is the neutral sheet, which is accessible until the end of the segment. WBD have requested BM2 for Plasma Sheet crossings and AKR. Three IM opportunities have been identified for 1h BM1 sessions.
     7
     812 May: There has been a lot of change to the draft plan, and there are now two 4h BM1 sessions near the eclipse OFF period. In orbit 2377, following the 4h BM1 session, a 12-hour no-data-taking period is necessary, to allow data to be downlinked before the AKR soon after perigee (in orbit 2378). Several BM1 periods for the NS have been changed to 2h so that more orbits are included. The list of BM and D0 'by orbit' is attached, as is the list of BM2 periods (since they appear similar to BM1 on the Bryant plots), and the D0 (no-data-taking) periods. The Bryant plots are also attached.