Version 3 (modified by mhapgood, 7 years ago) (diff) |
---|
MSP37.2
This segment covers the period from 15 July 2017 to 30 September 2017, orbits 2680 to 2713). The neutral sheet is accessible throughout the period. There is the 'long eclipse' season from 26/08/2017 to 05/09/2017, when the PLs are OFF at first for C1, C3 and C4, then ALL OFF from 28/08/2017, see the JSOC web page for details. There are manoeuvres during this period, 22/07/2017 (for all 4 SC), then on 31/07/2017, 11-12/08/2017, 23/09/2017, for some of them. The final Bryant plots are attached, and the single SC BM2 periods are also listed. The final by-orbit analysis is attached and the level of D0 (no-data-taking) is indicated.
Attachments (12)
-
bryant_msp_v3720_04_02_draft2.pdf
(33.8 KB) -
added by hwalker 8 years ago.
Draft Bryant plot for July 2017
-
bryant_msp_v3720_02_00_draft.pdf
(32.0 KB) -
added by hwalker 8 years ago.
Draft Bryant plot for August 2017
-
bryant_msp_v3720_00_22_draft.pdf
(32.2 KB) -
added by hwalker 8 years ago.
Draft Bryant plot for September 2017
-
MSP37p2_byorbit_draft.pdf
(46.9 KB) -
added by hwalker 8 years ago.
Draft 'by orbit' analysis of MSP37.2
-
MSP37p2_byorbit_final.pdf
(46.2 KB) -
added by mhapgood 7 years ago.
Final by-orbit analysis of MSP37.2
-
MSP37p2_singleSC_BM2.pdf
(32.7 KB) -
added by mhapgood 7 years ago.
List of Single SC BM2 periods
-
bryant_msp_v3721_04_02_final.pdf
(32.8 KB) -
added by mhapgood 7 years ago.
Final Bryant plot for July 2017
-
bryant_msp_v3721_02_00_final.pdf
(22.6 KB) -
added by mhapgood 7 years ago.
Final Bryant plot for August 2017
-
bryant_msp_v3721_00_22_final.pdf
(28.8 KB) -
added by mhapgood 7 years ago.
Final Bryant plot for September 2017
-
MSP37p2_4SC_BM1_final.pdf
(41.0 KB) -
added by mhapgood 7 years ago.
List of 4 SC BM1 periods
-
MSP37p2_4SC_BM2_final.pdf
(40.6 KB) -
added by mhapgood 7 years ago.
List of 4 SC BM2 periods
-
MSP37p2_singleSC_D0.pdf
(43.1 KB) -
added by mhapgood 7 years ago.
List of Single SC D0 periods
Download all attachments as: .zip