== MSP 30.3 and MSP 30.4 == This will cover the period 1 March to 30 May, orbits 2135 to 2174. It covers PP717 - PP729, and has manoeuvres in March and the last few eclipses at the start. PP720 will be used for the End-to-End test in preparation for power sharing, and PI teams are asked not to request single SC BM1s in PP720 if possible, to make the checking easier. Template Bryant plots are attached. The deadlines for MSP 30.3 and 30.4 (now known collectively as MSP 30.3) are shown, with an opportunity for the draft MSP30.3 to be reviewed.