Changes between Version 4 and Version 5 of MSP312


Ignore:
Timestamp:
Jun 25, 2014 12:16:02 PM (10 years ago)
Author:
hwalker
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • MSP312

    v4 v5  
    88The template Bryant plots for the periods are attached, and also on the jsoc website.
    99
    10 The draft for MSP31.2 is very full, and some BM1 sessions may need to be cut. There is a mixture of neutral sheet, some repeats of Retino, some substorm current wedge requests and a few Polar Cap sessions and ring current.
     10The draft for MSP31.2 is very full, and some BM1 sessions may need to be cut. There is a mixture of neutral sheet, some repeats of Retino, some substorm current wedge requests, a few magnetopause crossings, and a few Polar Cap sessions and ring current.
    1111The deadline for comments has been extended to Close of Business on 23 June.   
     12
     13As can be seen from the attached D0 (no-data-taking) pdf some very long D0 periods were added for orbits 2206 and 2207, to balance the long BM1 sessions (ESOC have been warned about this). The eclipse OFF periods on C1, C3, and C4 have been updated, to simplify the planning, since so significant events occur in the intervening ON-period. See the MSP web page for details.