| 15 | There are manoeuvres 15 October, 23/24 October, 29 October, 4 November, 13/14 November and 20 November. ESOC requires WEC to be OFF during manoeuvres and additionally EDI, FGM, and RAPID on C2 to be OFF during manoeuvres. The detailed times are given on the JSOC MSP web page (http://www.jsoc.rl.ac.uk/msp). This meant that the BM1 sessions had to be checked from mid-October to the end of the MSP since the perigee times had changed, as well as some perigees becoming unavailable due to the manoeuvre OFF periods (the start margin for C2 is 6 hours). An orbit-by-orbit list of activities has been attached, showing the changes. |