5 | 5 | The draft plan is released on 29 August, with draft Bryant plots and a draft list orbit by orbit of BM1 sessions. The review deadline has been changed to 2 Sep (Close of Business). Two orbits have been left for WBD at the Bow Shock, these will be used for BM2 (2271 and 2282), and WEC will operate C3 internally for the constraints on WBD periods. December is dominated by Pitout repeat BM1 sessions and Magnetopause BM1 periods, and January by Bow Shock BM1 sessions. There are some long periods of no-data-taking on C1, C2 and C3 in January 2015, and the apogee BM3 has been moved to just before the D0 period. The updated plan was released on 9 September - the Bryant plots and the list of D0 periods are attached. The orbit-by-orbit analysis is also attached. |