Version 3 (modified by hwalker, 10 years ago) (diff) |
---|
MSP32.1
This covers 29 Nov 2014 to 01 Feb 2015 (orbits 2256 to 2283). There are manoeuvres planned during December and January, and as the template Bryant plots show several BM1 sessions have been requested for the repeat of the Pitout GI investigations. The manoeuvres will affect the perigees of orbits 2269, 2280, and manoeuvres with C3 will additionally affect 2273, 2276. the ascii listing is on the web, and the Bryant plots are there too, as well as attached below. The deadline for input is 20 August, revised to 25 August.
The draft plan is released on 29 August, with draft Bryant plots and a draft list orbit by orbit of BM1 sessions. The review deadline has been changed to 2 Sep (Close of Business). Two orbits have been left for WBD at the Bow Shock, and these will be used for BM2 (2271 and 2282), and WEC will operate C3 internally for the constraints on WBD periods. December is dominated by Pitout repeat BM1 sessions, and January by Bow Shock BM1 sessions. The updated plan was released on 9 September - the Bryant plots and the list of D0 periods are attached.
Attachments (11)
-
bryant_msp_v3210_18_16_template.pdf
(33.8 KB) -
added by hwalker 10 years ago.
Template Bryant plot for Dec 2014
-
bryant_msp_v3210_16_14_template.pdf
(32.3 KB) -
added by hwalker 10 years ago.
Template Bryant plot for Jan 2015
-
bryant_msp_v3210_18_16_draft.pdf
(34.3 KB) -
added by hwalker 10 years ago.
Draft Bryant plot for Dec 2014
-
bryant_msp_v3210_16_14_draft.pdf
(33.1 KB) -
added by hwalker 10 years ago.
Draft Bryant plot for Jan 2015
-
MSP32p1_byorbit_draft.pdf
(44.5 KB) -
added by hwalker 10 years ago.
Draft plan orbit by orbit BM1
-
bryant_msp_v3210_18_16.pdf
(34.7 KB) -
added by hwalker 10 years ago.
Final Bryant plot for December 2014
-
bryant_msp_v3210_16_14.pdf
(33.3 KB) -
added by hwalker 10 years ago.
Final Bryant plot for January 2015
-
MSP32p1_single_SC_D0.pdf
(38.1 KB) -
added by hwalker 10 years ago.
No-data-taking periods in MSP32.1
-
MSP32p1_byorbit.pdf
(45.0 KB) -
added by hwalker 10 years ago.
List of BM1/2 and D0 by orbit for MSP32.1
-
bryant_msp_v3220_16_14_final3.pdf
(34.8 KB) -
added by hwalker 10 years ago.
Updated final Bryant plot for January 2015
-
MSP32p1_single_SC_D0_v2.pdf
(38.1 KB) -
added by hwalker 10 years ago.
Updated table with no-data-taking periods for single SC
Download all attachments as: .zip