    55The GI Alexandrova BM1 sessions occupy 10 orbits during eclipses, and long D0 periods will be needed before the eclipses in order to download the data so the perigee BM3s have been moved earlier. The last three orbits of MSP32.2 have not been declared yet - they will be either for SWT priorities or used as backup for the GI proposal. A PEACE cal BM1 has been put in orbit 2283, at the end of MSP32.1. The Bryant plots are attached.
    66
    7 The updated Bryant plot for February 2015, the by-orbit listing, and list of D0 periods are attached.
     7The updated Bryant plot for February 2015, the by-orbit listing, and list of D0 periods are attached. The data fill is 90% in this segment due to the eclipses.
     8
     9It was decided to merge the D0 periods with the PL OFF periods, and have them as PL OFF for the whole duration. There are a few exceptions where WBD has asked for NM1 near the eclipse, as shown in the draft and in these cases the D0 periods remain (shown as more than one satellite having the same timing in the pdf file attachment). ESOC requested a delay in PL ON in a few cases, so a complete list of all the off periods, PL OFF  and D0 (modes off), is given - MSP32p2_D0_PLOFF.pdf