6 | | 20 February: The draft Bryant plots, and the 'by orbit' list of activities have been attached to this page. In June, the no-data-taking is kept to a minimum to allow the GI Dunlop proposal to get as much data as possible in normal mode (NM1). There are a few Magnetopause sessions with BM1. In July the Neutral Sheet becomes available, and several BM1 sessions are scheduled for that region. A few BM2 sessions are scheduled (as shown in the attached 'by orbit' list) for WBD focussing on AKR, and plasma sheet. |
| 6 | 20 February: The draft Bryant plots, and the 'by orbit' list of activities have been attached to this page. In June, the no-data-taking is kept to a minimum to allow the GI Dunlop proposal to get as much data as possible in normal mode (NM1). There are a few Magnetopause sessions with BM1. In July the Neutral Sheet becomes available, and several BM1 sessions are scheduled for that region. A few BM2 sessions are scheduled (as shown in the attached 'by orbit' list) for WBD focussing on AKR, and plasma sheet. |
| 7 | |
| 8 | 27 February: The 'final' Bryant plots are available here (as attachments) and on the JSOC website. Also attached here are the pdfs for the 'by orbit' analysis, the list of the 4SC BM2 sessions, and the list of the D0 (no-data-taking) periods. An extra MP filler BM1 session was added in orbit 2336. |