Changes between Version 2 and Version 3 of MSP341
- Timestamp:
- Sep 23, 2015 12:08:11 PM (9 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
MSP341
v2 v3 4 4 5 5 14 September: The draft MSP34.1 is now available for review, and the deadline for comments has been extended to 17 September, Noon BST. The NM1 sessions proposed for the GI Bogdanova proposal for 2415/6 in MSP33.3 and 2427/8 have been changed to BM1. Not shown on the Bryant plots are the BM1 single SC sessions for the GI Khotyaintsev proposal: these cover 10 orbits from 2433 to 2442, with 1 hour on C1 and C2, and 7 hours on C3 and C4. The 4-hour equivalent on 4SC means that C1, C2, and C3 will need to have 24 hours of D0 (no-data-taking) to compensate. The list of timings is attached, as are the Bryant plots. 6 7 23 September: The final MSP34.1 is now available. The 'by-orbit' sheet shows the activities, and the D0 periods for orbits 2433 to 2442 for the GI Khotyaintsev were set to 23h for C1, C2 and C3, to avoid FGM issues with being in FGMEXTP for 24h. This resulted in a data fill of 107% which has been accepted by ESOC. The 23h D0 sessions have been placed in the outbound part of the orbit, and the outbound magnetopause not accessible for all 10 orbits. An attempt was made to keep the outbound bowshock for C3 and C4 accessible where possible (not orbit 2442).