wiki:MSP351

Version 3 (modified by hwalker, 9 years ago) (diff)

--

MSP35.1

This covers June and July 2016. The GI Foullon requests are executed in June, and in July the Plasma Sheet and Neutral Sheet are accessible. Some DOZC, and EQUA BM2 periods have been requested, and some single SC BM1 and BM2 periods for the AKR campaign. The BM3 periods have been deleted from the orbits requested for GI Foullon requests, and there will be long D0 (no-data-taking) periods on C1, C2 and C3, impacting the period around perigee. The by-orbit analysis has a preliminary estimate of how long the 4SC-equivalent D0 period will be.

4 April: There are manoeuvres on C1, C2, C3 on 3 June, 12 June and 1 August (see web page for details). The D0 periods have been placed (in June), after the long (5-hour) BM1 periods, usually just before perigee, so that the instruments are on in time for the Cusp crossings. In July there are several 4-hour BM1 periods around the Neutral Sheet or Plasma Sheet crossings. (Some of the single SC BM1 periods may be adjusted.

Attachments (14)

Download all attachments as: .zip