MSP35.1
This covers June and July 2016. The GI Foullon requests are executed in June, and in July the Plasma Sheet and Neutral Sheet are accessible. Some DOZC, and EQUA BM2 periods have been requested, and some single SC BM1 and BM2 periods for the AKR campaign. The BM3 periods have been deleted from the orbits requested for GI Foullon requests, and there will be long D0 (no-data-taking) periods on C1, C2 and C3, impacting the period around perigee. The by-orbit analysis has a preliminary estimate of how long the 4SC-equivalent D0 period will be.
4 April: There are manoeuvres on C1, C2, C3 on 3 June, 12 June and 1 August (see web page for details). The D0 periods have been placed (in June), after the long (5-hour) BM1 periods, usually just before perigee, so that the instruments are on in time for the Cusp crossings. In July there are several 4-hour BM1 periods around the Neutral Sheet or Plasma Sheet crossings. (Some of the single SC BM1 periods may be adjusted.
Attachments (14)
-
bryant_msp_v3510_06_04_draft.pdf
(32.0 KB) -
added by hwalker 9 years ago.
Draft Bryant plot for June 2016
-
bryant_msp_v3510_04_02_draft.pdf
(32.9 KB) -
added by hwalker 9 years ago.
Draft Bryant plot for July 2016
-
MSP35p1_byorbit_draft.pdf
(47.7 KB) -
added by hwalker 9 years ago.
Draft 'by-orbit' analysis of MSP35.1
-
bryant_msp_v3510_06_04_final.pdf
(31.9 KB) -
added by hwalker 9 years ago.
Final Bryant plot for June 2016
-
bryant_msp_v3510_04_02_final.pdf
(32.9 KB) -
added by hwalker 9 years ago.
Final Bryant plot for July 2016
-
MSP35p1_byorbit_final.pdf
(47.8 KB) -
added by hwalker 9 years ago.
Final 'by-orbit' analysis of MSP35.1
-
MSP35p1_singleSC_D0.pdf
(37.2 KB) -
added by hwalker 9 years ago.
D0 (no-data-taking) periods in MSP35.1
-
MSP35p1_singleSC_BM.pdf
(36.5 KB) -
added by hwalker 9 years ago.
Single SC BM periods in MSP35.1
-
MSP35p1_4SC_BM1.pdf
(40.8 KB) -
added by hwalker 9 years ago.
4SC BM1 periods in MSP35.1
-
MSP35p1_4SC_BM2.pdf
(36.0 KB) -
added by hwalker 9 years ago.
4SC BM2 periods in MSP35.1
-
bryant_msp_v3520_06_04_final2.pdf
(32.8 KB) -
added by hwalker 9 years ago.
Updated final Bryant plot for June 2016
-
bryant_msp_v3520_04_02_final2.pdf
(33.9 KB) -
added by hwalker 9 years ago.
Updated final Bryant plot for July 2016
-
MSP35p1_singleSC_D0.2.pdf
(37.2 KB) -
added by hwalker 9 years ago.
D0 (no-data-taking) list with updated timing for orbit 2503
-
bryant_msp_v3520_04_02_final3.pdf
(33.9 KB) -
added by hwalker 9 years ago.
Final Bryant plot for July 2016 (with BM2 in 2521, 2524, 2527 moved)