Version 2 (modified by hwalker, 9 years ago) (diff) |
---|
MSP35.2
This covers August and September 2016, and includes the 'Long Eclipse' OFF period. All four SC are switched off from 24/08/2016 22:09 to 02/09/2016 02:00, and C1, C3, C4 are switched off from 22/08/2016 19:24. The priority remains the Plasma Sheet. The attached template Bryant plots use the newest orbit files (LTOFs/LTEFs (20160203).
20 May: The draft Bryant plots and by orbit analysis for MSP35.2 are available. The timings of the single SC BM2 periods and the D0 periods are not given, since this is the draft release.
Attachments (16)
-
bryant_msp_v3520_02_00_template2.pdf
(28.2 KB) -
added by hwalker 9 years ago.
Template Bryant plot for August 2016
-
bryant_msp_v3520_00_22_template2.pdf
(31.5 KB) -
added by hwalker 9 years ago.
Template Bryant plot for September 2016
-
bryant_msp_v3520_02_00_draft.pdf
(33.3 KB) -
added by hwalker 9 years ago.
Draft Bryant plot for August 2016
-
bryant_msp_v3520_00_22_draft.pdf
(32.1 KB) -
added by hwalker 9 years ago.
Draft Bryant plot for September 2016
-
MSP35p2_byorbit_draft.pdf
(46.2 KB) -
added by hwalker 9 years ago.
By orbit analysis of the draft plan for MSP35.2
-
bryant_msp_v3520_02_00_final.pdf
(33.4 KB) -
added by hwalker 8 years ago.
Final Bryant plot for August 2016
-
bryant_msp_v3520_00_22_final.pdf
(32.2 KB) -
added by hwalker 8 years ago.
Final Bryant plot for September 2016
-
MSP35p2_singleSC_D0.pdf
(32.6 KB) -
added by hwalker 8 years ago.
Single SC D0 (no-data-taking) periods in MSP35.2
-
MSP35p2_singleSC_BM2.pdf
(33.5 KB) -
added by hwalker 8 years ago.
Single SC BM2 periods in MSP35.2
-
MSP35p2_byorbit_final.pdf
(46.4 KB) -
added by hwalker 8 years ago.
Final 'by-orbit' analysis for MSP35.2
-
bryant_msp_v3530_02_00_final2.pdf
(34.7 KB) -
added by hwalker 8 years ago.
Updated 'final' Bryant plot for August 2016
-
bryant_msp_v3530_00_22_final2.pdf
(33.0 KB) -
added by hwalker 8 years ago.
Updated 'final' Bryant plot for September 2016
-
MSP35p2_singleSC_D0_update.pdf
(32.7 KB) -
added by hwalker 8 years ago.
Updated D0 (no-data-taking) periods in MSP35.2
-
MSP35p2_singleSC_BM2_update.pdf
(35.8 KB) -
added by hwalker 8 years ago.
Updated single SC BM2 periods in MSP35.2
-
MSP35p2_byorbit_final2.pdf
(69.6 KB) -
added by hwalker 8 years ago.
Updated 'final' by-orbit analysis of MSP35.2
-
MSP35p2_singleSC_D0_update2.pdf
(35.9 KB) -
added by hwalker 8 years ago.
Updated/corrected final D0 list for MSP35.2
Download all attachments as: .zip