Changes between Version 341 and Version 342 of WikiStart


Ignore:
Timestamp:
Jun 11, 2023 4:14:30 PM (18 months ago)
Author:
ybogdanova
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WikiStart

    v341 v342  
    9090The period includes a season of ‘Long Eclipses’ in September-early October 2023 when all instruments will be switched off.
    9191
    92 The preliminary dates for the payload to be off are (the ESOC's dates TBC):
    93 
    94 * C34   13/09/2023 10:00 - 23/09/2023 18:00
    95 * C1    19/09/2023 05:00 - 02/10/2023 13:00
    96 * C2    19/09/2023 21:00 - 04/10/2023 17:00
     92The ESOC's dates for the payload to be off during the Long Eclipse season are:
     93
     94* C34   13/09/2023 04:00 - 23/09/2023 18:00
     95* C1    19/09/2023 00:00 - 02/10/2023 18:00
     96* C2    19/09/2023 12:00 - 05/10/2023 00:00
    9797
    9898There will no moon eclipses in this segment.
     
    131131This segment covers the period from 30 June 2023 to 22 September 2023 (ending during the Autumn 2023 eclipse season).
    132132
    133 The preliminary dates for the payload to be off during the long eclipses season are (the exact dates are TBC by ESOC):
    134 
    135 * C34   13/09/2023 10:00 - 23/09/2023 18:00
    136 * C1    19/09/2023 05:00 - 02/10/2023 13:00
    137 * C2    19/09/2023 21:00 - 04/10/2023 17:00
     133The ESOC's dates for the payload to be off during the Long Eclipse season are:
     134
     135* C34   13/09/2023 04:00 - 23/09/2023 18:00
     136* C1    19/09/2023 00:00 - 02/10/2023 18:00
     137* C2    19/09/2023 12:00 - 05/10/2023 00:00
    138138
    139139Baseline telemetry is 140% on average, although telemetry is variable through the segment to accommodate the science targets. 
     
    151151** Science planning for orbit 3642 (PP1175) was changed on 18/05/2023 - 40 mins of BM2 on SC12 (single SC operations) were added to maximise science return of potential northern AAR observations.
    152152
    153 ** Science planning for PP1177 (orbits 3648, 3649, and 3651) was changed on 23/05/2023 - three BM1 intervals (2h each, 4 SC-ops) were added to the MSP based on a late request to support multi-misssion tail conjunctions. Updated tables are MSP49p2_byorbit_draft_v3.pdf and MSP49p2-4SC_BM1_draft_v2.pdf
     153** Science planning for PP1177 (orbits 3648, 3649, and 3651) was changed on 23/05/2023 - three BM1 intervals (2h each, 4 SC-ops) were added to the MSP based on a late request to support multi-mission tail conjunctions. Updated tables are MSP49p2_byorbit_draft_v3.pdf and MSP49p2-4SC_BM1_draft_v2.pdf
     154
     155** Science planning after orbit 3664 (PPs 1182-1186) was changed on 11/06/2023 to accommodate a multi-mission tail conjunctions (late request) and the start of the eclipse season based on ESOC's timetable. Updated tables are MSP49p2_byorbit_draft_v4.pdf, MSP49p2-4SC_BM1_draft_v3.pdf, and MSP49p2-4SC_BM2_draft_v2.pdf
    154156
    155157
     
    159161This segment covers the period from 22 September to 01 December 2023 (starting during the Autumn 2023 eclipse season).
    160162
    161 The preliminary dates for the payload to be off during the long eclipses season are (the exact dates are TBC by ESOC):
    162 
    163 * C34   13/09/2023 10:00 - 23/09/2023 18:00
    164 * C1    19/09/2023 05:00 - 02/10/2023 13:00
    165 * C2    19/09/2023 21:00 - 04/10/2023 17:00
     163The ESOC's dates for the payload to be off during the Long Eclipse season are:
     164
     165* C34   13/09/2023 04:00 - 23/09/2023 18:00
     166* C1    19/09/2023 00:00 - 02/10/2023 18:00
     167* C2    19/09/2023 12:00 - 05/10/2023 00:00
    166168
    167169Baseline telemetry is 140% on average.