138 | | There will be re-entry manoeuvres on SC2 on 15/01/2024, 16/01/2024, 24/01/2024, 25/01/2025 and on 01/02/2024, 02/02/2024 (February's manoeuvres are back-up). The full timetable is available here http://jsocwiki.rl.ac.uk/attachment/wiki/WikiStart/manoeuvres_nov2023_feb2024_SC2.pdf. These manoeuvres have an increased margins and all instruments will be switched off for the whole duration of the manoeuvres.The payload on SC2 was switched off for the short eclipse season at the start of 01 February 2024 manouvre, so the 'science data re-start' times for 01/02/2024 and 02/02/2024 manoeuvres were esimated but not used in the planning and commanding as all paylad on SC2 stayed off. |
| 138 | There will be re-entry manoeuvres on SC2 on 15/01/2024, 16/01/2024, 24/01/2024, 25/01/2025 and on 01/02/2024, 02/02/2024 (February's manoeuvres are back-up). The full timetable is available here http://jsocwiki.rl.ac.uk/attachment/wiki/WikiStart/manoeuvres_nov2023_feb2024_SC2.pdf. These manoeuvres have an increased margins and all instruments will be switched off for the whole duration of the manoeuvres.The payload on SC2 was switched off for the short eclipse season at the start of 01 February 2024 manouvre, so the 'science data re-start' times for 01/02/2024 and 02/02/2024 manoeuvres were estimated but not used in the planning and commanding as all payload on SC2 stayed off. |