Changes between Version 1 and Version 2 of MSP341


Ignore:
Timestamp:
Sep 14, 2015 9:45:43 AM (9 years ago)
Author:
hwalker
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • MSP341

    v1 v2  
    11== MSP34.1 ==
    22
    3 This covers December 2015 and January 2016, and there are manoeuvres for C3 during this period. The GI Bogdanova proposal reserves NM1 during perigee in 2423/4 and 2427/8 in December, and the GI Khotyaintsev proposal will be executed in January, when C3 and C4 are around 3.4km apart at the Bow Shock. The magnetopause is accessible throughout MSP34.1, and the Bow Shock becomes accessible in January. The template Bryant plots for December and January are attached.
     3This covers December 2015 and January 2016, and there are manoeuvres for C3 during this period. There is a moon eclipse on 12 December which affects all 4 SC. The GI Bogdanova proposal reserves NM1 during perigee in 2423/4 and 2427/8 in December, and the GI Khotyaintsev proposal will be executed in January, when C3 and C4 are around 3.4km apart at the Bow Shock. The magnetopause is accessible throughout MSP34.1, and the Bow Shock becomes accessible in January. The template Bryant plots for December and January are attached.
     4
     514 September: The draft MSP34.1 is now available for review, and the deadline for comments has been extended to 17 September, Noon BST. The NM1 sessions proposed for the GI Bogdanova proposal for 2415/6 in MSP33.3 and 2427/8 have been changed to BM1. Not shown on the Bryant plots are the BM1 single SC sessions for the GI Khotyaintsev proposal: these cover 10 orbits from 2433 to 2442, with 1 hour on C1 and C2, and 7 hours on C3 and C4. The 4-hour equivalent on 4SC means that C1, C2, and C3 will need to have 24 hours of D0 (no-data-taking) to compensate. The list of timings is attached, as are the Bryant plots.