Changes between Version 1 and Version 2 of MSP394
- Timestamp:
- Jul 25, 2018 2:05:02 PM (6 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
MSP394
v1 v2 1 2 == '''MSP 39.4''' == 3 1 4 2 5 This segment covers the period from 04 September to 02 November 2018. The neutral sheet is accessible throughout. The payload on C3/C4 is switched on after eclipse season on 07/09/2019 at 00:00 and on C1/C2 on 09/09/2018 at 00:00. C3 payload is off on 26 September for the period 08:57-19:17 for a manoeuvre.