wiki:MSP402

MSP 40.2

This segment covers the period from 12 March to 25 May 2019. After eclipse season, the payload is back on C3 and C4 on 12/03/2019 06:00 and on C1 and C2 on 14/03/2019 18:00. The magnetopause is accessible throughout, and the bow shock will be accessible until the end of April. There are manoeuvres on 18 March (C1), 21 April (C3), and 9 May (C3). From 18 March 2019 manoeuvre, the margin for the payload off interval after the end of manoeuvre is shortned by 5 hours in comparison with the previously used margins.

This segment also inludes "moon eclipses" on spacecraft 3 and 4 on 5 April 2019. The instruments on C3 and C4 will be switched off for the period 05/04/2019 01:00 - 05/04/2019 23:00. In addition, there will be no BM1, BM2 or WBD operations on C3 and C4 between 04/04/2019 00:00 and 05/04/2019 23:00.

This segment has 130% data volume.

Last modified 6 years ago Last modified on Mar 28, 2019 3:25:58 PM

Attachments (12)

Download all attachments as: .zip