Changes between Version 2 and Version 3 of MSP402
- Timestamp:
- Jan 25, 2019 1:45:27 PM (6 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
MSP402
v2 v3 3 3 4 4 5 This segment covers the period from 12 March to 18 May 2019. The magnetopause is accessible throughout, and the bow shock will be accessible until the end of April. There are manoeuvres on 18 March (C1), 21 April (C3), and 9 May (C3). After eclipse season, the paylad is on on C3 and C4 on 12/03/2019 06:00 and on C1 and C2 on 14/03/2019 18:00. This segment has 130% data volume.5 This segment covers the period from 12 March to 25 May 2019. After eclipse season, the payload is back on C3 and C4 on 12/03/2019 06:00 and on C1 and C2 on 14/03/2019 18:00. The magnetopause is accessible throughout, and the bow shock will be accessible until the end of April. There are manoeuvres on 18 March (C1), 21 April (C3), and 9 May (C3). From 18 March 2019 manoeuvre, the margin for the payload off interval after the end of manoeuvre is shortned by 6 hours in comparison with the previously used margins. 6 6 7 This segment also inludes "moon eclipses" on spacecraft 3 and 4 on 5 April 2019. The instruments on C3 and C4 will be switched off for the period 05/04/2019 01:00 - 05/04/2019 23:00. In addition, there will be no BM1, BM2 or WBD operations on C3 and C4 between 04/04/2019 00:00 and 05/04/2019 23:00. 8 9 This segment has 130% data volume. 10