Version 4 (modified by ybogdanova, 6 years ago) (diff) |
---|
MSP 40.2
This segment covers the period from 12 March to 25 May 2019. After eclipse season, the payload is back on C3 and C4 on 12/03/2019 06:00 and on C1 and C2 on 14/03/2019 18:00. The magnetopause is accessible throughout, and the bow shock will be accessible until the end of April. There are manoeuvres on 18 March (C1), 21 April (C3), and 9 May (C3). From 18 March 2019 manoeuvre, the margin for the payload off interval after the end of manoeuvre is shortned by 5 hours in comparison with the previously used margins.
This segment also inludes "moon eclipses" on spacecraft 3 and 4 on 5 April 2019. The instruments on C3 and C4 will be switched off for the period 05/04/2019 01:00 - 05/04/2019 23:00. In addition, there will be no BM1, BM2 or WBD operations on C3 and C4 between 04/04/2019 00:00 and 05/04/2019 23:00.
This segment has 130% data volume.
Attachments (12)
-
MSP40p2_byorbit_draft.pdf
(54.2 KB) -
added by ybogdanova 6 years ago.
Draft 'by orbit' analysis of MSP40.2
-
MSP40p2-4SC_BM1_draft.pdf
(45.9 KB) -
added by ybogdanova 6 years ago.
Draft list of 4 SC BM1 periods
-
MSP40p2-4SC_BM2_draft.pdf
(41.7 KB) -
added by ybogdanova 6 years ago.
Draft list of 4 SC BM2 periods
-
MSP40p2_singleSC_Bm1.pdf
(47.0 KB) -
added by ybogdanova 6 years ago.
Draft list of Single SC BM1 periods
-
MSP40p2_singleSC_D0.pdf
(41.1 KB) -
added by ybogdanova 6 years ago.
Draft list of Single SC D0 periods
-
bryant_msp4020_February_2019.pdf
(78.1 KB) -
added by ybogdanova 6 years ago.
Bryant Plot for February 2019
-
bryant_msp4020_March_2019.pdf
(41.9 KB) -
added by ybogdanova 6 years ago.
Bryant Plot for March 2019
-
bryant_msp4020_April_2019.pdf
(42.8 KB) -
added by ybogdanova 6 years ago.
Bryant Plot for April 2019
-
bryant_msp4020_May_2019.pdf
(41.1 KB) -
added by ybogdanova 6 years ago.
Bryant Plot for May 2019
-
bryant_msp4020_Dayside_2019.pdf
(61.5 KB) -
added by ybogdanova 6 years ago.
Bryant Plot for the dayside season 2019
-
MSP40p2_singleSC_Bm2.pdf
(48.3 KB) -
added by ybogdanova 6 years ago.
Draft list of Single SC BM2 periods
-
MSP40p2_singleSC_D0_v2.pdf
(41.2 KB) -
added by ybogdanova 6 years ago.
Updated version of the draft list of Single SC D0 periods
Download all attachments as: .zip