Version 1 (modified by ybogdanova, 4 years ago) (diff) |
---|
This segment covers the period from 06 December 2020 to 18 March 2021 (before and including the short eclipse season 2021) and has 135-140% data volume as a baseline.
For the eclipse season the payload will be off, preliminary dates are: SC1: 24/02/2021 10:00 - 21/03/2021 12:00; SC2: 22/02/2021 05:30 - 23/03/2021 17:00; SC3 & S4: 24/02/2021 10:00 - 19/03/2021 04:00
There are no manoeuvres during this MSP segment.
Preliminary main science targets are the ECS GI programme on Cluster/MMS conjunctions at the magnetopause, high-latitude northern cusp, magnetopause, and bow shock. The BM1 data for the PEACE/WHISPER cross-calibration in the magnetosheath also will be collected.
Attachments (12)
-
MSP44p1_byorbit_draft.pdf
(57.6 KB) -
added by ybogdanova 4 years ago.
Draft 'by orbit' analysis of MSP44.1
-
MSP44p1_singleSC_Bm1.pdf
(48.3 KB) -
added by ybogdanova 4 years ago.
Draft list of Single SC BM1 periods
-
MSP44p1-4SC_BM1_draft.pdf
(51.9 KB) -
added by ybogdanova 4 years ago.
Draft list of 4 SC BM1 periods
-
MSP44p1-4SC_BM2_draft.pdf
(50.1 KB) -
added by ybogdanova 4 years ago.
Draft list of 4 SC BM2 periods
-
bryant_msp_v4410_October_2020.pdf
(40.5 KB) -
added by ybogdanova 4 years ago.
Bryant Plot for October 2020
-
bryant_msp_v4410_November_2020.pdf
(40.4 KB) -
added by ybogdanova 4 years ago.
Bryant Plot for November 2020
-
bryant_msp_v4410_December_2020.pdf
(41.7 KB) -
added by ybogdanova 4 years ago.
Bryant Plot for December 2020
-
bryant_msp_v4410_January_2021.pdf
(40.0 KB) -
added by ybogdanova 4 years ago.
Bryant Plot for January 2021
-
bryant_msp_v4410_February_2021.pdf
(41.0 KB) -
added by ybogdanova 4 years ago.
Bryant Plot for February 2021
-
bryant_msp_v4410_March_2021.pdf
(37.5 KB) -
added by ybogdanova 4 years ago.
Bryant Plot for March 2021
-
bryant_msp_v4410_Dayside_2021.pdf
(61.2 KB) -
added by ybogdanova 4 years ago.
Bryant plot template for the Dayside season 2021
-
MSP44p1-4SC_BM1_draft_updated.pdf
(52.0 KB) -
added by ybogdanova 4 years ago.
UPDATED draft list of 4 SC BM1 periods
Download all attachments as: .zip