Changes between Version 5 and Version 6 of MSP502
- Timestamp:
- May 2, 2024 2:06:03 PM (7 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
MSP502
v5 v6 7 7 Baseline telemetry is 140%. 8 8 9 On SC2 only FGM, PEACE and WECare planned to be switched on after the eclipse season.9 On SC2 only FGM, PEACE, WEC and RAPID are planned to be switched on after the eclipse season. 10 10 11 11 The period includes part of the ‘Short Eclipses’ in February - May 2024 when all instruments will be switched off. … … 24 24 25 25 26 The main science targets are conjunctions between Cluster and MMS and/or THEMIS at the magnetopause, bow shock and inside the magnetosheath, and auroral acceleration region in the southern hemisphere.26 The main science targets are conjunctions between Cluster and MMS and/or THEMIS at the magnetopause, bow shock and inside the magnetosheath, and auroral acceleration region in the northern hemisphere. 27 27 28 28 This segment does not have single-SC BM2 operations.